Wednesday 25 May 2011

At m.i.t

we are nailing our floor down and then we can put up our walls, on the edge its 150mm. going up the floor is 200mm. after this we put up our walls as you can see in the next picture.we are moving our frames to our sleep outs then we level it all up the with the sidewalls the put up our front frame then we nail it temporary.


No comments:

Post a Comment

about myself