Wednesday, 25 May 2011

At m.i.t

we are nailing our floor down and then we can put up our walls, on the edge its 150mm. going up the floor is 200mm. after this we put up our walls as you can see in the next picture.we are moving our frames to our sleep outs then we level it all up the with the sidewalls the put up our front frame then we nail it temporary.


Wednesday, 4 May 2011

2/05/11

On monday the 2 of May it was raining and we went into the the workshop to make a BBQ table, which didnt take long. we went into to groups of 3-4 and made different parts to our a BBQ table. my group was in charge for the bracing parts, in this picture we are cutting the small the braces that go underneith the top plate. then we go and get the wood for the runners and cut the angles. then we realized the runners were to short so we decieded to make longer ones.





here in this picture we are drilling the bolt holes. then we put the bolts through then we sorted out 180 mm each side of the seat and the top planks, then we put it on like the picture below.

 